Part Number
    Please enter a valid full or partial manufacturer part number with a minimum of 3 letters or numbers

    SOAK Search Results

    Documents mentioning SOAK

    Document Partial File Text Tags Type PDF
    Ramp/Soak Process Controller E5CK--T Advanced,
    Ramp/Soak Process Controller E5CK--T Advanced, 1/16-DIN Ramp/Soak Process Controllers Ideal for Worldwide Use D D D D D D D D D Offers one pattern of simple programming control, up to four patterns with communications (16 steps per pattern). Water-resistant front face meets IP66/NEMA 4 (indoor
    Original PDF
    General Technical Information Recommended
    General Technical Information Recommended Soldering Profiles For Surface Mount Tantalum Capacitors Component Land Temperature °C IR and Convection Reflow Assembly exits heat no forced cooldown Additional soak time to allow uniform heating of the substrate
    Original PDF
    ■ STANDARD SOLDERING CONDITIONS Sufficient
    ■ STANDARD SOLDERING CONDITIONS Sufficient preheating of the product Is required. Temperature difference A T between the soJder tempera­ ture and the part surface is to be within the limit indicated in the table. In case oi quick cooling- soaking in solvent after soldering,
    OCR Scan PDF
    reflow profile
    CD-SP2 Recommended Solder Reflow Profile Parameter Average temperature gradient in preheating Soak Time Time Above 217°C Time Above 230°C Time Above 250°C Peak Temperature in reflow Temperature gradient in cooling Reference soak t1 t2 t3 Tpeak Specification
    Original PDF
    !Notice (other) 1. Cleaning Conditions: The total
    !Notice (other) 1. Cleaning Conditions: The total cleaning time of soaking, ultrasonic and steam methods should be within 5 minutes. Consult with Murata concerning the cleaning solvent. In order to totally abolish ODC (Freon, Trichrolethan), Murata has carried out testing on non-cleaning and water cleaning (watersoluble flux, water-soluble cream solder, water-based cleaning
    Original PDF
    ELCURIGID High screened coaxial RF-cable with tin
    ELCURIGID High screened coaxial RF-cable with tin soaked braid Business Group Industrial Applications 1 Title SN 39 225 E Stand: 24.11.99 Seite 1 v 6 Detail specification for high screened coaxial RF-cable with tin soaked braid 2 Specifications Generic specification:
    Original PDF
    ba2901
    Reliability Test Result DEVICE: BA2901 Family RESULT ITEM METHOD n pn (pcs) (pcs) - 22×3 10sec 22×3 CONDITION Resistance to Soldering Heat<#1> Soldering heat stress (IR reflow : peak 260°C) Resistance to Soldering Heat<#1> Soak into solder tub 260±3°C
    Original PDF
    bd9701cp-v5
    Reliability Test Result DEVICE : BD9701CP-V5 RESULT ITEM Resistance to Soldering Heat(*2) METHOD n pn (pcs) (pcs) - 22 CONDITION After the moisture soaking treatment, carry out the soldering heat stress (IR reflow : peak 260°C) Resistance to Soldering Heat(*2)
    Original PDF
    Reliability Test Result DEVICE : BU16027KV RESULT
    Reliability Test Result DEVICE : BU16027KV RESULT ITEM METHOD n pn (pcs) (pcs) − 22 CONDITION Resistance to Soldering Heat(*2) After the moisture soaking treatment, carry out the soldering heat stress (IR reflow : peak 260℃) Temperature Cycling(*1) Tstg min (30min) / Tstg max (30min)
    Original PDF
    Reliability Test Result DEVICE : BR93H□□-W Series
    Reliability Test Result DEVICE : BR93H□□-W Series RESULT ITEM METHOD CONDITION n(pcs) pn(pcs) - 77 x 3 Resistance to Soldering Heat (*2) After the moisture soaking treatment, carry out the soldering heat stress (IR reflow : peak 260℃) Resistance to Soldering Heat (*2)
    Original PDF
    bu16024kv
    Reliability Test Result DEVICE : BU16024KV RESULT ITEM METHOD n pn (pcs) (pcs) − 22 CONDITION Resistance to Soldering Heat(*2) After the moisture soaking treatment, carry out the soldering heat stress (IR reflow : peak 260℃) Temperature Cycling(*1) Tstg min (30min) / Tstg max (30min)
    Original PDF
    bu52013hfv
    Reliability Test Result DEVICE : BU52013HFV RESULT ITEM METHOD n pn (pcs) (pcs) − 22 CONDITION Resistance to Soldering Heat(*2) After the moisture soaking treatment, carry out the soldering heat stress (IR reflow : peak 260℃) Thermal Shock(*1) 100℃(5min) / 0℃ (5min)
    Original PDF
    bd9842
    Reliability Test Result DEVICE : BD9842FV RESULT ITEM METHOD n pn (pcs) (pcs) - 22 CONDITION Resistance to Soldering Heat(*2) After the moisture soaking treatment, carry out the soldering heat stress (IR reflow : peak 260℃) Resistance to Soldering Heat(*2)
    Original PDF
    bu52003gul
    Reliability Test Result DEVICE : BU52003GUL RESULT ITEM METHOD n pn (pcs) (pcs) − 22 CONDITION Resistance to Soldering Heat(*2) After the moisture soaking treatment, carry out the soldering heat stress (IR reflow : peak 260℃) Thermal Shock(*1) 100℃(5min) / 0℃ (5min)
    Original PDF
    bd9134muv
    Reliability Test Result DEVICE : BD9134MUV RESULT ITEM Resistance to Soldering Heat(*2) METHOD n pn (pcs) (pcs) - 22 CONDITION After the moisture soaking treatment, carry out the soldering heat stress (IR reflow : peak 260°C) Thermal Shock(*1) 100°C (5min) / 0°C (5min)
    Original PDF