400L-060 Search Results
400L-060 Result Highlights (5)
| Part | ECAD Model | Manufacturer | Description | Download | Buy |
|---|---|---|---|---|---|
| 10127397-10H1400LF |
|
PwrBlade® ULTRA, Power Connectors, R/A Header Assembly 10HP12S STB | |||
| 54112-811502400LF |
|
BergStik®, Board to Board connector, Unshrouded vertical stacked header, Through Hole, Double Row, 50 Positions, 2.54mm (0.100in) Pitch. | |||
| 54112-111081400LF |
|
BergStik®, Board to Board connector, 2.54mm (0.100in), Unshrouded vertical stacking Header, Through Hole, Double Row, 8 Positions | |||
| 54242-807341400LF |
|
BergStik®, Board to Board connector, Unshrouded vertical stacked header, Surface Mount, Double Row, 34 Positions, 2.54mm (0.100in) Pitch. | |||
| 61083-162400LF |
|
BergStak® 0.80mm Pitch, Mezzanine Connector, Vertical Header, Double Row, 160 Positions. |
400L-060 Price and Stock
Brennan Industries
Brennan Industries 6400-L-06-06-OHYDRAULIC HOSE ADAPTER, STRAIGHT LNG, 3/8 IN MALE JIC X 3/8 IN MALE O-RING BOSS |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
6400-L-06-06-O | Bulk | 10 | 3 Weeks | 1 |
|
Buy Now | ||||
Brennan Industries D7400-L06-06-EDL06MBT-06MBSPP ED STRAIGHT |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
D7400-L06-06-ED | Bulk | 5 Weeks | 1 |
|
Get Quote | |||||
Brennan Industries D7400-L06-02-CFL06MBT-02MBSPP CF STRAIGHT |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
D7400-L06-02-CF | Bulk | 5 Weeks | 1 |
|
Get Quote | |||||
Brennan Industries 6400-L-06-06-O-SS06MJ-06MORB STRAIGHT LONG STNLS (2.31 OAL) |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
6400-L-06-06-O-SS | Bulk | 5 Weeks | 1 |
|
Get Quote | |||||
Brennan Industries D7400-L06-04-EDL06MBT-04MBSPP ED STRAIGHT |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
D7400-L06-04-ED | Bulk | 5 Weeks | 1 |
|
Get Quote | |||||