-TOP250 Search Results
-TOP250 Datasheets (8)
Select Manufacturer
| Part | ECAD Model | Manufacturer | Description | Datasheet Type | PDF Size | Page count | |
|---|---|---|---|---|---|---|---|
| TOP250 | Kexin | TOPSwitch GX Family Extended Power, Design Flexible, EcoSmart, Integrated Off-line Switcher | Original | 296.71KB | 6 | ||
| TOP250 | Power Integrations | Extended Power, Design Flexible, EcoSmart, Integrated Off-line Switcher | Original | 465.16KB | 52 | ||
| TOP250F | Power Integrations | TOPSwitch -GX Family Extended Power, Design Flexible, EcoSmart, Integrated Off-line Switcher | Original | 456.79KB | 52 | ||
| TOP250FN | Power Integrations | PMIC - AC DC Converters, Offline Switchers, Integrated Circuits (ICs), IC OFFLINE SWIT UVLO HV TO262 | Original | 52 | |||
| TOP250R | Power Integrations | TOPSwitch -GX Family Extended Power, Design Flexible, EcoSmart, Integrated Off-line Switcher | Original | 456.79KB | 52 | ||
| TOP250R-TL | Power Integrations | PMIC - AC DC Converters, Offline Switchers, Integrated Circuits (ICs), IC OFFLINE SWIT UVLO HV D2PAK | Original | 52 | |||
| TOP250Y | Power Integrations | TOPSwitch -GX Family Extended Power, Design Flexible, EcoSmart, Integrated Off-line Switcher | Original | 456.79KB | 52 | ||
| TOP250YN | Power Integrations | IC SW OFF-LINE PS 210/290W TO220 | Original | 2.25MB | 52 |
-TOP250 Price and Stock
Select Manufacturer
Power Integrations TOP250YN- Rail/Tube (Alt: TOP250YN) |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
TOP250YN | Tube | 8 Weeks | 500 |
|
Buy Now | |||||
|
TOP250YN | 694 |
|
Buy Now | |||||||
|
TOP250YN | Bulk | 978 | 1 |
|
Buy Now | |||||
|
TOP250YN | 209 | 1 |
|
Buy Now | ||||||
|
TOP250YN | 2,500 | 8 Weeks | 500 |
|
Buy Now | |||||
|
TOP250YN | 2,500 | 10 Weeks | 500 |
|
Buy Now | |||||
|
TOP250YN | 10,000 |
|
Buy Now | |||||||
Power Integrations TOP250R-TL- Tape and Reel (Alt: TOP250R-TL) |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
TOP250R-TL | Tape & Reel | 8 Weeks | 750 |
|
Buy Now | |||||
|
TOP250R-TL |
|
Get Quote | ||||||||
|
TOP250R-TL | Tape & Reel | 1,566 | 100 |
|
Buy Now | |||||
| TOP250R-TL | Cut Tape | 1,566 | 1 |
|
Buy Now | ||||||
|
TOP250R-TL | 1 |
|
Get Quote | |||||||
|
TOP250R-TL | 10 Weeks | 750 |
|
Get Quote | ||||||
Power Integrations TOP250R- Rail/Tube (Alt: TOP250R) |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
TOP250R | Tube | 1 |
|
Get Quote | ||||||
Starrett Company DSTOP250781 Bore Gauge Depthstop For 0.080" - .250" |Starrett DSTOP250 |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
DSTOP250 | Bulk | 1 |
|
Buy Now | ||||||
Power Integrations TOP250YN-TLExtended Power Design Flexible EcoSmart Integrated Offline Switcher (Alt: TOP250YN-TL) |
|||||||||||
| Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
|
TOP250YN-TL | 18 Weeks | 1 |
|
Get Quote | ||||||