R1/R210) Search Results
R1/R210) Result Highlights (5)
Part | ECAD Model | Manufacturer | Description | Download | Buy |
---|---|---|---|---|---|
PHEC80R-R210LF |
![]() |
PHEN/PHEC Board-to-Board Connector, Right Angle Receptacle, 1.27mm (0.05inch). | |||
HM2P09PDR210N9LF |
![]() |
Back Plane Connectors,2mm Hard Metric Series,Millipacs, Vertical Header, Type C with peg 2.5mm, 55 Signal Pin, Press Fit Tail, 250 mating cycles and ROHS Compliant | |||
HM2P09PDR210N2LF |
![]() |
MillipacsĀ®, Back Plane Connectors, 2mm Hard Metric Series 5 Row vertical Press-Fit Header, Type C with 28 Signal Pins and RoHS compatible | |||
MSP430FR2100IPW16R |
![]() |
16 MHz Ultra-Low-Power Microcontroller With 1 KB FRAM, 0.5 KB SRAM, 12 IO, 8 ch 10-bit ADC 16-TSSOP -40 to 85 |
![]() |
![]() |
|
MSP430FR2100IRLLT |
![]() |
16 MHz Ultra-Low-Power Microcontroller With 1 KB FRAM, 0.5 KB SRAM, 12 IO, 8 ch 10-bit ADC 24-VQFN -40 to 85 |
![]() |
![]() |
R1/R210) Price and Stock
ams OSRAM Group
ams OSRAM Group LS-A676-R1R2-1-0-20-R33-Z-XXLED RED CLEAR SMD R/A |
|||||||||||
Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
![]() |
LS-A676-R1R2-1-0-20-R33-Z-XX | Reel |
|
Buy Now | |||||||
ams OSRAM Group LS-Y876-R1R2-1-0-20-R18-Z-XXLED SMARTLED |
|||||||||||
Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
![]() |
LS-Y876-R1R2-1-0-20-R18-Z-XX | Reel |
|
Buy Now | |||||||
ams OSRAM Group LS-A676-R1R2-1-0-20-R33-Z-JCLED RED CLEAR SMD R/A |
|||||||||||
Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
![]() |
LS-A676-R1R2-1-0-20-R33-Z-JC | Reel |
|
Buy Now | |||||||
ams OSRAM Group LS T676-R1R2-1-0-20-R33-Z(Alt: LS T676-R1R2-1-0-20-R33-Z) |
|||||||||||
Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
![]() |
LS T676-R1R2-1-0-20-R33-Z | 14 Weeks | 8,000 |
|
Get Quote | ||||||
ams OSRAM Group LS T676-R1R2-1-0-20-R18-Z(Alt: LS T676-R1R2-1-0-20-R18-Z) |
|||||||||||
Distributors | Part | Package | Stock | Lead Time | Min Order Qty | Price | Buy | ||||
![]() |
LS T676-R1R2-1-0-20-R18-Z | 14 Weeks | 20,000 |
|
Get Quote |